Avoids Farringdon Street (16 Nov 2026 20:00 – 27 Nov 2026 05:00)
SAFETY, BY DISTANCE
AVOIDED ALONG THE WAY
Avoids Holborn
Busier roads or shared pathsAvoids dangerous junction Theobalds Road onto Jockey's Fields
Roadworks on Hatton Garden
Department for TransportRoadworks on Princeton Street
Department for TransportAvoids cycleway
Reported by ridersAvoids Joan Street
Reported by ridersAvoids Leather Lane
Weekday lunchtime street marketELEVATION
26 m of climbing on the SuperSafe™ route, 22 m on the direct route.
About 18 min at an easy pace on the SuperSafe™ route, which is 4.5 km. The most direct route is 4.2 km and takes about 17 min, with more of it on busier roads.
SuperSafe™ goes via cycleway and Clerkenwell Road, using C6 and CS7. 89% of the route is on quiet streets and cycleways; the rest is short stretches with some traffic, mostly at crossings.
No. It climbs 26 m in total and is flat for almost all of it.
Yes, in the Cyclemate app for iPhone and Android. Open this page on your phone and tap Open in Cyclemate: the route loads in the app, ready to start with turn-by-turn navigation from Elephant and Castle.
After dark, Cyclemate plans a SuperSafe™ Night route that prefers well-lit roads, and shows how much of the ride is lit next to how much is quiet. Plan the trip in the app with a night-time departure to compare.
Yes. Cyclemate is free to download on iPhone and Android, and SuperSafe™ directions and the live London map are included.
It is planned live on Cyclemate's London map, which picks up new cycleways, roadworks and closures, and reports from riders. When the streets change, so does the route.