Avoids Kingsway (24 Sep 2026 10:00 – 11 Nov 2026 03:25)
SAFETY, BY DISTANCE
AVOIDED ALONG THE WAY
Avoids Holborn
Busier roads or shared pathsRoadworks on Kingsway
Department for TransportRoadworks on Long Acre
Department for TransportELEVATION
6 m of climbing on the SuperSafe™ route, 2 m on the direct route.
About 15 min at an easy pace on the SuperSafe™ route, which is 3.7 km. The most direct route is 2.9 km and takes about 12 min, with more of it on busier roads.
SuperSafe™ goes via Wellington Street, Victoria Embankment and Blackfriars Bridge, using C52, C10, C3, (C6) and C6. 84% of the route is on quiet streets and cycleways; the rest is short stretches with some traffic, mostly at crossings.
No. It climbs 6 m in total and is flat for almost all of it.
Yes, in the Cyclemate app for iPhone and Android. Open this page on your phone and tap Open in Cyclemate: the route loads in the app, ready to start with turn-by-turn navigation from Bloomsbury.
After dark, Cyclemate plans a SuperSafe™ Night route that prefers well-lit roads, and shows how much of the ride is lit next to how much is quiet. Plan the trip in the app with a night-time departure to compare.
Yes. Cyclemate is free to download on iPhone and Android, and SuperSafe™ directions and the live London map are included.
It is planned live on Cyclemate's London map, which picks up new cycleways, roadworks and closures, and reports from riders. When the streets change, so does the route.