Avoids Westbourne Terrace (27 Oct 2026 08:00 – 4 Dec 2026 17:00)
SAFETY, BY DISTANCE
AVOIDED ALONG THE WAY
Avoids Kilburn High Road
Busier roads or shared pathsRoadworks on Cleveland Terrace
Department for TransportRoadworks on Kilburn High Road
Department for TransportRoadworks on Tanner Lane
Department for TransportAvoids ['Grand Union Canal Towpath', 'Grand Union Canal (Paddington Arm) towpath', 'Grand Union Canal towpath']
Reported by ridersAvoids Grand Union Canal towpath
Reported by ridersAvoids Westbourne Bridge
Reported by ridersELEVATION
12 m of climbing on the SuperSafe™ route, 15 m on the direct route.
About 21 min at an easy pace on the SuperSafe™ route, which is 5.4 km. The most direct route is 4.4 km and takes about 18 min, with more of it on busier roads.
SuperSafe™ goes via Salusbury Road, Randolph Avenue and Westbourne Terrace Road Bridge. 91% of the route is on quiet streets and cycleways; the rest is short stretches with some traffic, mostly at crossings.
No. It climbs 12 m in total and is flat for almost all of it.
Yes, in the Cyclemate app for iPhone and Android. Open this page on your phone and tap Open in Cyclemate: the route loads in the app, ready to start with turn-by-turn navigation from Kilburn.
After dark, Cyclemate plans a SuperSafe™ Night route that prefers well-lit roads, and shows how much of the ride is lit next to how much is quiet. Plan the trip in the app with a night-time departure to compare.
Yes. Cyclemate is free to download on iPhone and Android, and SuperSafe™ directions and the live London map are included.
It is planned live on Cyclemate's London map, which picks up new cycleways, roadworks and closures, and reports from riders. When the streets change, so does the route.