West End to Olympic Village
Dynamic route · Learn more
4.9 km · 20 min
West End
West End to Olympic Village is 4.9 km by bike and takes about 20 min on flat roads. About 98% of the SuperSafe™ route is on quiet streets and bike paths, including Haro, Smithe, Richards, Nelson, Cambie Bridge, Bypass, Seaside, TCT, Central Valley and Ontario. It runs along Broughton Street, Haro Street and Richards Street. The most direct route is 4.4 km and takes about 17 min, but about 2% of it is on busier roads or shared paths. SuperSafe™ adds about 2 minutes, staying on calmer streets instead. The ride ends in Olympic Village, and the Cyclemate app plans it live, so new bike paths, roadworks and rider reports change the route as they land.
SuperSafe™via Haro Street, Nelson Street and Seaside Greenway - False Creek South
20 min
98% Quiet
Flat
3 mi
Haro
Smithe
Richards
Nelson
Cambie Bridge
Bypass
Seaside
TCT
Central Valley
Ontario
Elevation
Ascent↗ 13 ft
Descent↘ 98 ft
TerrainFlat
Max grade0.9%
Route Stops
West End
Olympic Village
Total4.9 km · 20 min
Will fetch the latest SuperSafe™ route when you start. Last fetched 39m ago.
ReviewsYou can leave a review after completing this route

Why this route?

Takes the Seaside cycleway

SAFETY, BY DISTANCE

SuperSafe™4.9 km · 20 min
Direct4.4 km · 17 min
  • Cycle route
  • Protected / quiet
  • Moderate
  • Busier road
  • Shared with pedestrians

ELEVATION

4 m of climbing on the SuperSafe™ route, 6 m on the direct route.

SuperSafe™ -26 mDirect -27 m

The route, street by street

  1. Broughton StreetQuiet streets
    145 m
  2. Broughton StreetQuiet streets
    94 m
  3. Haro StreetBike path · Haro · Smithe
    1.3 km
  4. Richards StreetBike path · Smithe · Richards
    177 m
  5. Nelson StreetBike path · Richards · Nelson · Cambie Bridge
    1.4 km
  6. West 2nd AvenueBike path · Cambie Bridge · Bypass
    35 m
  7. CyclewayBike path · Bypass
    162 m
  8. Seaside BypassBike path · Bypass
    273 m
  9. Spyglass PlaceBike path · Bypass
    61 m
  10. Seaside Greenway - False Creek SouthBike path · Bypass · Seaside · TCT
    939 m
  11. Ontario GreenwayBike path · Bypass · Central Valley · Ontario · Seaside
    256 m
  12. Unnamed pathSome traffic
    61 m
  • Cycle route
  • Protected / quiet
  • Moderate
  • Busier road
  • Shared with pedestrians
How SuperSafe™ works →

Questions

How long does it take to cycle from West End to Olympic Village?

About 20 min at an easy pace on the SuperSafe™ route, which is 4.9 km. The most direct route is 4.4 km and takes about 17 min, with more of it on busier roads.

What is the safest way to cycle from West End to Olympic Village?

SuperSafe™ goes via Haro Street, Nelson Street and Seaside Greenway - False Creek South, using Haro, Smithe, Richards, Nelson, Cambie Bridge, Bypass, Seaside, TCT, Central Valley and Ontario. 98% of the route is on quiet streets and bike paths; the rest is short stretches with some traffic, mostly at crossings.

Is the ride from West End to Olympic Village hilly?

No. It climbs 4 m in total and is flat for almost all of it.

Can I get turn-by-turn directions for this route?

Yes, in the Cyclemate app for iPhone and Android. Open this page on your phone and tap Open in Cyclemate: the route loads in the app, ready to start with turn-by-turn navigation from West End.

Is the Cyclemate app free?

Yes. Cyclemate is free to download on iPhone and Android, and SuperSafe™ directions and the live Vancouver map are included.

Why does the route change?

It is planned live on Cyclemate's Vancouver map, which picks up new bike paths, roadworks and closures, and reports from riders. When the streets change, so does the route.

Routes nearby

Maps and rides