Avoids Danforth Avenue
SAFETY, BY DISTANCE
AVOIDED ALONG THE WAY
Avoids Bloor Street East
Busier roads or shared pathsELEVATION
6 m of climbing on the SuperSafe™ route, 2 m on the direct route.
About 24 min at an easy pace on the SuperSafe™ route, which is 5.9 km. The most direct route is 5.8 km and takes about 23 min, with more of it on busier roads.
SuperSafe™ goes via Carlaw Avenue, Dundas Street East and Shuter Street, using Danforth and Dundas. 78% of the route is on quiet streets and bike paths; the rest is short stretches with some traffic, mostly at crossings.
No. It climbs 6 m in total and is flat for almost all of it.
Yes, in the Cyclemate app for iPhone and Android. Open this page on your phone and tap Open in Cyclemate: the route loads in the app, ready to start with turn-by-turn navigation from Greektown.
Yes. Cyclemate is free to download on iPhone and Android, and SuperSafe™ directions and the live Toronto map are included.
It is planned live on Cyclemate's Toronto map, which picks up new bike paths, roadworks and closures, and reports from riders. When the streets change, so does the route.