Avoids Portland Street
SAFETY, BY DISTANCE
AVOIDED ALONG THE WAY
Avoids Portland Street, Great Bridgewater Street and Lever Street
Busier roads or shared pathsELEVATION
31 m of climbing on the SuperSafe™ route, 23 m on the direct route.
About 36 min at an easy pace on the SuperSafe™ route, which is 9.1 km. The most direct route is 6.9 km and takes about 27 min, with more of it on busier roads.
SuperSafe™ goes via cycleway, using Media City Link, Stretford Cycleway and Chorlton Cycleway. 86% of the route is on quiet streets and cycleways; the rest is short stretches with some traffic, mostly at crossings.
Not really. It climbs 31 m in total, with no steep stretches.
Yes, in the Cyclemate app for iPhone and Android. Open this page on your phone and tap Open in Cyclemate: the route loads in the app, ready to start with turn-by-turn navigation from Salford Quays.
Yes. Cyclemate is free to download on iPhone and Android, and SuperSafe™ directions and the live Manchester map are included.
It is planned live on Cyclemate's Manchester map, which picks up new cycleways, roadworks and closures, and reports from riders. When the streets change, so does the route.